|
CEST 65 |
Public Works Plans and Estimating |
Description: | Reading and interpreting plans, and estimating time, material, labor and equipment needed for public works projects. Concepts include quantity take-offs, construction layout, rehabilitation, maintenance, inspection and testing with material cost estimating of public works improvements. Proper use of basic survey methods, symbols, mathematical conversions, determination of slope, grade, location and quantities are covered. |
Transferability: | CSU |
Repeatability: | Two Repeats if Grade was D, F, NC, or NP |
Grading Type: | Grade Only |
Sections listed are for |
|
|
|